Home ProductsSlipper Making Machine

Energy Saving PVC PCU Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole

Energy Saving PVC PCU Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole

    • Energy Saving PVC PCU Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole
    • Energy Saving PVC PCU Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole
    • Energy Saving PVC PCU Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole
  • Energy Saving PVC PCU Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole

    Product Details:

    Place of Origin: Dongguan City, China
    Brand Name: Kingstone
    Certification: CE, SGS
    Model Number: JL-108

    Payment & Shipping Terms:

    Minimum Order Quantity: 1SET
    Price: negotiable
    Packaging Details: Standard Export Package, One container
    Delivery Time: 25-45 DAYS
    Payment Terms: D/A, D/P, L/C, T/T, Western Union
    Supply Ability: 50 SET PER MONTH
    Contact Now
    Detailed Product Description
    Brand: Kingstone Origin: Taiwan And Italy
    Products: Can Make Slippers, Sandals, Flip Flops Weight: 5TONS
    Color: 1/2 Colors Spare Parts: Brands, From Taiwan, German, Etc.

     
    PVC PCU Material Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole JL-108
     
     
    What is the application of our machine?
     
    Energy Saving PVC PCU Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole
     
    Why Choose us?
     
    Our 5S management principle.
    1. To share our 30 years experiences with our respected customer.
    2. To supply whole production line for making shoes (Include Machine, Mould, Material).
    3. To support our customer on Factory Building, Factory Management, Production & Package for Shoes, Sales Layout, Market Development.
    4. To service customer with machine operation and maintenance.
    5. To solve the problem quickly and efficiently on the after sales service.
     
    Features:
     
    1. By computer, Electrical box, PLC control---more simple, fast and precision.
    2. It could be equipped with air blowing system. --- can produce light weight, particularly the need for reinforced cooling effect.
    3. Computerization in analysis and design---the machine is well in stability.
    4. Conformed to human engineering in design---it features operational compatibility.
    5. It could be equipped with servo system. --- can save 30~40% electricity.
    6. It could be equipped with cooling system. --- can cooling the mould and extend the mould life.
    7. The well-interconnected oil circuit by electric control --- can reduce waiting time, quicken production rate, and promote productivity.

     

    Specifications
    Machine model JL-108
    Mould-clamping Unit
    Work station   12,16,20,24,30
    Clamping force TON 80
    Opening stroke MM 210
    Mould dimension MM 600*280
    Height of injection nozzle MM 280
    Injection Unit
    Injector SET 1
    Screw diameter MM 60/65/70
    Screw L/D ratio L/D 20
    Max.injection volume cm3 650-1000
    Injection speed Cm/s 10
    Screw rotation speed R.P.M 0-200
    Electricity Consumption Normal Servo
    Heating power of injector KW 7 7
    Hydraulic unit motor KW 18.5 15.7+7.5
    Total power KW 25.5 30.2
    Temperature control Section 4 4
    Power consumption per hour Kw/h 15-20 7-10
    Dimension and Weight 24 Stations
    Machine dimension (L*W*H)MM 4600*3600*2300
    Machine weight KGS 6000
    *Note:Above data only for reference.
     

    Payment Terms
     
    1. Negotiated, 30% T/T down payment , balance shall be paid before shipment.
    2. T/T, Westem Union, PayPal, Escow, MoneyGram.
     
    Machine Production Time
     
    25-45 days after confirm deposit.
     
    Packing
     
    Professional export package, plastic film packing, or Wooden case packing.
     
    Shipping
     
    By Sea, One Container for one machine

     
    Production Process
     
    Below is the process for produce full shoes, easy operate.
    It need 1-3 people for the full process.
     
    Energy Saving PVC PCU Slipper Making Machine For Children's Cartoon Shoe Slipper Sandal Sole
     
    After-sales Service
     
    1 We will send technicians to buyer's factory for installation and training for 5-10days;
    2 Our technicians will help you to install machine and works machine;
    3 After the machine works well, our technicians will teach your workers how to produce shoes, and how to solve some emergency conditions.
    4 After your workers can produce shoes very skilled, then our technicians back.
    5 Also you can send your technicians to our factory for training.
    6 Any questions can contact us, we will reply you within 24 hours.
     
    Welcome to Kingstone Machinery!

    Contact Details
    Kingstone Shoe-making Machinery Co. Ltd.

    Contact Person: Kingstone

    Send your inquiry directly to us (0 / 3000)